The big project this week was the fabrication and installation of two new bulkheads. The new bulkhead will make the boat much stronger. It was really interesting to see the process of creating a composite part from start to finish.
One layer of Biax is laid up onto the MDF base |
A strip of Biax is laid up to form the base of the flange |
The foam core is then laid on top of the MDF base |
Mid set break |
The foam core is then covered by a final layer of Biax |
Vacuum bag it |
Bake it |
Finished part |
As Vlad would say, Smuck it in |
Ready to be tabbed |
I got to do my first vacuum bagging all by myself. I installed a small patch of Biax to reinforce a filled in hole.
It was a simple job |
We removed all the stickers from the stern of the boat to prepare the stern for sanding.
Before |
After |
We also have been preparing the front longitudinal for repair.
I spent this weekend up in Newport, Rhode Island. There were a total of nine webbies in Newport this weekend with me.
We had a fun Superbowl party |
No comments:
Post a Comment